Based on our experienced specialists we are capable to provide design services for high and medium voltage substations, for both primary and secondary circuits, as well as parameterization and commissioning for protections, SCADA and metering systems for the power field.
Our consultancy activity covers a diversity of studies addressing the challenging needs of our clients in terms of reliability and safety of energy production, transmission, distribution and supply, cost efficiency of energy supply, energy quality, or other specific needs.
What we do
- Leading Electrical Teams
- Power Grid Automation
- Design for Substations and Extensions
- Configuration and Connection Studies
- Feasibility Studies
- Risk Assessment Studies
- Due Diligence
- Tender Specifications
- Technical support in applying for the Connection Permit (ATR).
Representative Projects
- Extension of the 400 kV Gura Ialomitei GIS Substation
- New 110 / 20 kV Babadag Substation for Babadag 1 Wind Power Plant
- Configuration and connection study for 600 MW Dobromir Wind Power Plants
- Automatic generator separation within Petrobrazi Platform
- Extension of 400 kV Stupina Substation
- New 400 / 30 kV Substation for 97.5 MW Crucea Wind Power Plant
- Connection to 110 kV network of Lafarge Substation, Targu Jiu
- Relays settings calculation study for 6 – 110 kV Petrobrazi
- Relay settings calculation for 400 / 110 / 30 kV Substation conecting Rahmanu Wind Power Plant
- Power connection study for 97.5 MW Crucea Wind Power Plant
- Power grid automation study for Petrobrazi CCPP
- Study to identify potential CCPP projects in Romania
- Due diligence for 450 MW Independenta Wind Power Plant
- Risk assessment study for 50 MW Pecineaga 2 Wind Power Plant
- Connection to the grid for Doljchim Photovoltaic Power Plant
- Power supply optimisation for Doljchim industrial platform
More than
25
projects
25
projects